97在线观看免费完整版高清_久久精品亚洲国产精品_女人高潮a级毛片_日韩无码第五二页_五月天免费人成网站_一级黄毛片无毒不卡_免费又黄又爽a视频免费看_337p日本欧洲亚洲大胆精筑_久久精品动漫99国产精品动漫_午夜成人在线一区无码

        熱線電話
        百葉窗圖片載入中
        ?
        聯(lián)系我們

        Guangdong Lituo automation equipment Co., Ltd

        Contact: Mr. Zhang

        Sales Hotline: 18665717216

        Telephone: 020-84551179

        Fax: 020-31076026

        QQ:731306804

        Mailbox: zhangging@litou668.com

        URL: www.cmchl.com

        Address: Almond altar town, shunde district, foshan city, GaoZan Village Gao Gui Lucy 2 no. 1 # 3

        How to adjust the operation of the coating machine?

        How to adjust the operation of the coating machine?

        In this age of mechanization, any work is done using machines, but for the wrapping machine, if there is a quality problem in use. Well, do you know how to debug? Your first response is to shut down the machine and debug it. But the mechanical involved too many products. If stopped, the entire production could be scrapped. And in the face of such a thing, do you know how to debug the coating machine?

        Debugging of woodworking cladding machine:

        1, the location for the profile: take a good production profile, requirements: not bent or distorted, on the bed on a conveying wheel, according to the profile width, shape and coating requirements, adjustment between the two rows of the conveying wheel distance; adjustment by foot and platform width and height, which is suitable for coating profile requirements installed on both sides of the guide wheel; the conveying wheel is parallel to the direction of movement and profile.

        2 、 press wheel installation and adjustment: according to the profile of the profile to install and adjust the small pressure roller, generally choose profiles central line or section, the outline of the main curve of points or low, along the contour line by point transition, rolling. Compound the profile with the diaphragm. Installation of small pressure wheel to make the line force balance, about the same time. There is a press wheel, the bottom must be installed support wheel, make the line up, down, left and right force balance. Otherwise, the line will appear at the junction of false and so on. The large plane can be crushed by the small pressure wheel from the center to the two sides, and the small pressure wheel 3 will gradually rotate at the 90 degree corner. The shape of the complex lines, small pressure wheel should be arranged naturally, can not be forced to shape. In particular, decorative paper should be more natural and smooth.

        Application of coating machine 3, rubber box or roll coating system

        The cold box operation method:

        Unloading of rubber box: the rubber box is lifted up smoothly and the rubber box is naturally separated from the platform.

        Adjust the thickness of the adhesive layer: adjust the thickness of the adhesive layer by turning the lifting bolts at the lower sides of the rubber box.

        The roller coating device use:

        Can adjust the coating layer thickness on the rotating shaft frictioning plastic box. Turn the adjusting handle, turn clockwise, thicken the rubber band, turn counterclockwise, and make the adhesive layer thin. Until the coating is even.

        中宁县| 晴隆县| 麻城市| 桦川县| 兴安县| 松阳县| 曲阳县| 婺源县| 泊头市| 潼关县| 宁武县| 财经| 耿马| 岑巩县| 台北市| 黄龙县| 福贡县| 齐齐哈尔市| 宜川县| 平定县| 青铜峡市| 乌拉特中旗| 错那县| 塔河县| 闸北区| 斗六市| 桃园市| 卫辉市| 福建省| 遂昌县| 昂仁县| 巴青县| 铁力市| 石柱| 鹤峰县| 江孜县| 黎城县| 石楼县| 宣武区| 繁昌县| 东阳市|